Automatic Beverage Processing System is used in juice, carbonated beverage preparing, blending, sterilizing.,etc before filling. Beverage mixing plant adopts professional process design, high-quality sanitary valve fittings, precision control instruments and electronic control components. It provides customers with various equipment such as extraction, sugar melting, dispensing, homogenization, degassing, UHT.,etc. Beverage processing plant capacity from 1T up to 100T as per customer needed.
Highest output combined with highest effciency
A new benchmark in block technology
11% less heating energy consumption;20% less blowing air consumption;40% less filling valves due to dual filling concept
Signficantly reduced scrap-rate due to skip and run technology
Neck handing at the labelling carousel for highest precision
“No bottle-no label”function to avoid label losses
No spillage-no product losses
lowest energy and media consumption per bottle
| Hot water system | Supply hot water to sugar dissolving, tea extracting, juice, ingredient, milk restoration etc. |
|---|---|
| Sugar dissolving system | Use good quality sugar to dissolve in certain hot water to make syrup, after hot preservation,pasteurization, filtration, and cooling down, then store to use. |
| Ingredient system | Supply restored juice, stabilizing agent etc. |
| Batching System | To pump syrup, other main material and ingredient, juice, RO water basing on certain ratio and certain order. Mixing all the materials in batching tank to make the liquid even, check sample, stew, and then go to next step. |
| CIP system | CIP system is designed to clean and sanitize. It is a necessary system in food production.Use alkali and acid as the media, under the effect of heat exchanger to clean all the valves,tanks, pipes etc. So as to reach the safety standard. |
| Extracting System | To put tea into a basket, tank bottom or rotate tank, and then add hot water, after filtration and cooling to batching tanks. |
Address: In Cambodia Phnom Penh City
In Australia Brisbane city
We conduct a 24-hour non-stop running test with actual bottles in our factory before delivery.
Yes. Our dispatch engineers will travel to your site for mechanical assembly, debugging, and staff training.
Detailed lead time will be provided in our official quotation upon inquiry. Typically 30-45 days.
Flexible payment options available, including T/T, L/C, etc., negotiable based on the project.
7×24 Fast Response: Lifetime online technical support with rapid response within 2 hours.
Warranty & Spares: 2-year comprehensive warranty with sufficient stock of quick-wear parts.
🛡️ 100% Factory Direct Price | CE & ISO Certified | 40+ Countries Served Successfully